Ref_OLP_ActProg_Prog
Program
The program is the top level of the flow chart
On the graphical element a pie menu can be opened to execute some support function for the program.
Here a program can be locked to prevent it against unwanted or unrecognized changes.
In case a program is loaded in a (new) software version that requires a re-computation of the program, for example because of improved geometry approximation algorithms, the system automatically and by default locks the program.
Was this page helpful?
