Skip to Content
PagesWpcRelink all the control points

Relink all the control points

The Relink all control points command all the control point that have lost their reference will have a new reference assigned in one single operation. Each control point will be moved (projected) onto the nearest edge of the remaining reference surfaces.

Was this page helpful?